earned value calculations for all project activities (or summary level activities) are required to estimate the earned value for the entire project. t/f

Answers

Answer 1

False. Earned value calculations for all project activities or summary level activities are not required to estimate the earned value for the entire project.

The earned value is a technique used in project management to measure the progress of a project and compare it to the planned performance. While it is ideal to have earned value calculations for all project activities, it is not always practical or necessary.

Earned value calculations can be performed at various levels of the project, depending on the project's size and complexity. It is common to perform earned value calculations at the work package level or major milestone level, rather than calculating it for each individual activity.

By focusing on key deliverables or significant phases of the project, an accurate estimation of the project's overall earned value can be obtained without the need to calculate it for every single activity. This approach allows for a more efficient and practical application of the earned value management technique.

learn more about activities here; brainly.com/question/1133404

#SPJ11


Related Questions

Which of the following is true of social listening? a) It requires high/evels of concentration to ensure that messages are received. b) It is often referred to as active listening. c) It is typically used in listening to music, a concert, or a television program. d) It is associated with events that require a high degree of thinking to sort through, interpret, and understand. e) It is characterized by high levels of cognitive activity. Which of the following is true of activation questions? a) They show the negative impact of a problem so that finding a solution to that problem is desirable. b) They are succeeded by discovery questions. c) They are used to smooth the transition from needs discovery into the presentation and demonstration of a proposed solution's features. d) They include broad and generalized inquiries to assess a buyer's situation. e) They mainly consist of closed-end questions and are used in the first stage of the ADAPT questioning system. Which of the following is a difference between open-end questions and closed-end questions? a) Open-end questions limit a customer's response to one or two words, whereas closed-end questions allow a customer to respond freely. b) Open-end questions are also known as dichotomous questions, whereas closed-end questions are also known as multiple-choice questions. c) Closed-end questions deliver richer and more expansive information than open-end questions. d) Open-end questions are directive forms of questioning, whereas closedend questions are nondirective forms of questioning. e) Open-end questions are best used for discovery and exploration, whereas closed-end questions are best used-for

Answers

a) False b) False c) False d) False e) True, Activation questions are questions that are designed to show the negative impact of a problem so that finding a solution to that problem is desirable.

The correct statement is e) It is characterized by high levels of cognitive activity. Social listening refers to actively monitoring and analyzing online conversations and discussions to gain insights into customer opinions, preferences, and trends.

It involves actively paying attention to online content and engaging in cognitive activities such as understanding, interpreting, and analyzing the messages received. It is not limited to concentration alone but involves processing and comprehending the information shared in digital conversations. Social listening is a valuable tool for businesses to gather valuable insights and make informed decisions based on the information gathered from online platforms.

Learn more about Social listening

https://brainly.com/question/32828334

#SPJ11

Congress passed the Equal Pay Act of 1973 which required employers to

Answers

The equal pay right was so the couldn’t pay women unequal wages .

what are some really good exercises? im 5"5 and weight is 183.....im a thicc gurl, so just trying to slim my tum down.. ive looked for help everywhere and cant find anything. i have developed heart issues bec of my weight...if you have any tips let me know .....thank you ps. i wouldnt be doing this if i didnt have to, this is my last resort....again thank you very much ps.ps. sorry its the wrong subject there was no physical ed

Answers

Answer:

Okay, so I would suggest starting every morning with a small jog/walk (outside/treadmill. Having a well balanced diet, veggies,fruit,protein,fat. To answer your question... i'm guessing you're think. You can have a some sweets but don't eat them every day. So my main tips, 1. Eat Health 2. Get Yourself on a workout routine 3. Good Sleep (9-10 hours).

Explanation:

Jogging/walking gets you warmed up and its cardio, which is good for your heart,

P.S. If you ever nead more help friend me and ask a question.

I hope this helps

UwU

Answer: Try to have healthier eating habits.

Explanation: if you have healthier eating habits and you have smaller portions, but everybody's body is different so you have to try different things. Hope that helps a lil bit

brainiest if you get it correct
When approaching an intersection for a left turn, you should approach the intersection:


by cutting into the left lane immediately before the intersection.



as near as possible to the right hand curb.



in the far left lane or center (turning) lane.

Answers

When approaching an intersection for a left turn, you should approach the intersection:

in the far left lane or center (turning) lane.

When preparing to make a left turn, it is important to position your vehicle in the appropriate lane for turning left. This typically means being in the far left lane or a designated center turning lane if available. By being in the correct lane, you can safely and efficiently make the left turn without disrupting the flow of traffic in other lanes. It is important to follow traffic rules and signals while approaching and making left turns to ensure the safety of yourself and other road users.

\(\huge{\mathfrak{\colorbox{black}{\textcolor{lime}{I\:hope\:this\:helps\:!\:\:}}}}\)

♥️ \(\large{\underline{\textcolor{red}{\mathcal{SUMIT\:\:ROY\:\:(:\:\:}}}}\)

Final answer:

To make a left turn at an intersection, it is recommended to approach the intersection in the far left lane or center (turning) lane. This is due to basic traffic safety rules that aim to signal your intent to other drivers. However, these rules can vary by location and road type.

Explanation:

When approaching an intersection for a left turn, it is generally recommended to be in the far left lane or center (turning) lane. This is a basic practice according to most driving and traffic safety rules. The idea behind this is that by taking the lane leading into your desired direction, you signal your intent to other drivers. It's also crucial to remember that specific rules might vary depending on your location and the type of road you are traveling on.

Learn more about Left Turn at Intersections here:

https://brainly.com/question/13006321

#SPJ2

What makes countries interdependent?

a
Specialization and trade
b
Technology and education
c
Government and religion
d
Taxes on imports and exports

Answers

C government and religion

Answer:

A. Specialization and trade

Explanation:

I took the test.

what happens once in a lifetime, twice in a moment, but never in one hundred years?

Answers

Answer:

if the question is a riddle the I think the answer is the letter "m"

Explanation:

Answer:

The letter 'M'

Explanation:

if you look at the words 'Minute' and 'Moment', they both start with an 'M' :)

Paddling a student is a violation of the Code of Ethics?
True
False

Answers

The answer is true.

Paddling a student is a violation of the Code of Ethics, is true. Thus, option A is correct.

What is the Code of Ethics?

A code of Ethics can be determined as a set of rules and regulations to protect the rights and beliefs of a person or an organization. these code dictate the atmosphere and the rules of that organization. These ethics may be different depending on the company.

Paddling a student means when the student is beaten by a paddle on his lower back due to some reason like misbehaving or mischief in a class. as the paddling hurts, it was considered as a form of punishment.

According to the ethical code of conduct, paddling a student with or without his or his parent's consent is treated as an offense and is punishable if found guilty. Therefore, option A is the correct option.

Learn more about the Code of Ethics, here:

https://brainly.com/question/12990307

#SPJ2

How does perception lead to stereotyping a person?

Answers

They both have the same characteristics. There are things that we have picked up from our experiences. So they can affect our perception of things in our behavior without us being aware of it.

Ten-year-old cora has attention-deficit hyperactivity disorder (adhd). cora’s __________ than her unaffected agemates.

Answers

Ten-year-old Cora has attention-deficit hyperactivity disorder (ADHD). cora’s brain is probably growing more slowly than her unaffected agemates.

ADHD is one of the maximum commonplace neurodevelopmental disorders of youth. it is also first diagnosed in early life and frequently lasts into adulthood. children with ADHD might also have trouble paying interest, controlling impulsive behaviors (may also act without considering what the result may be), or be overly energetic.

ADHD regularly starts offevolved in formative years and may persist into maturity. it may make contributions to low, troubled relationships, and trouble at faculty or work. Signs and symptoms include restrained attention and hyperactivity. Remedies encompass medication and communication therapy.

Human beings with ADHD regularly describe their lives as feeling chaotic and out of management. they might seem careless because they're scrambling to find their telephone or to pay that bill, however they may be overwhelmed.

Learn more about ADHD here: https://brainly.com/question/7633033

#SPJ1

list 3 Political Icons/heroes in T&T Also indicate their contribution How have we hamoured these icons​

Answers

Answer:

Donald trump joebiden Braden hurley

Explanation:

rigy there

Which of the following is NOT a consequence to an organization that has suffered a data security breach?
a. Reputation damage
b. Monetary fine
c. De-escalation of reporting requirements
d. IP theft

Answers

De-escalation of reporting requirements is not a consequence to an organization that has suffered a data security breach.

Depending at the form of records involved, the outcomes can consist of destruction or corruption of databases, the leaking of private statistics, the robbery of highbrow assets and regulatory necessities to inform and in all likelihood compensate the ones affected.

Potential proceedings from clients whose statistics has been exposed. Ransomware needs from attackers. Recovery costs – for example, restoring or patching structures which have been breached. Reputational harm and lack of clients.

In GDPR and different privateness laws, the records controller has the maximum duty on the subject of protective the privateness and rights of the records subject, along with the consumer of a website. Simply put, the records controller controls the strategies and motive of records usage.

To learn more about consequence, click here:

https://brainly.com/question/15101610

#SPJ4

8.
What is a log boat?
A form of boat that removes decaying logs from the sea.
A boat that Captain Jack Sparrow was on.
O A boat made from a single log.
OA boat made exclusively from fine North Carolina wood.

Answers

Answer:

O A boat made from a single log.

Explanation:

Log boat is the one of the simplest form of boat that can be produced without too much work. It's made by craving a single log in the middle to provide enough space for one or two people to sit in.

This is the type of boat that's most commonly used by native Americans. Dugout Canoe that they often used can be considered as some sort of log boat.

This boat can only be used to travel in a short distance and can only be moved by using mechanical energy from the rows.

Discuss the pros and cons of using application integration versus application interfaces.

Answers

The advantage of application integration is that it enables seamless communication and data exchange between different software applications, on the other hand, application interfaces provide a standardized way for applications to interact with each other.

The main advantage of application integration is that it enables seamless communication and data exchange between different software applications, allowing for streamlined processes, improved efficiency, and enhanced decision-making.

It eliminates the need for manual data entry and reduces the risk of errors and inconsistencies.

On the other hand, application interfaces provide a standardized way for applications to interact with each other, simplifying the development process and promoting interoperability. They allow for more flexibility and customization in integrating specific functionalities or data elements.

However, there are also drawbacks to consider. Application integration can be complex and time-consuming, requiring significant effort and resources to establish and maintain. It may involve modifying existing systems or developing custom solutions, which can be costly and may introduce compatibility issues.

In contrast, application interfaces may have limitations in terms of the functionalities they support or the data they can transfer. They may require additional development work to accommodate specific integration requirements.

In summary, application integration offers seamless communication and process optimization, while application interfaces provide standardized interaction and flexibility. The choice between the two depends on the specific integration needs, complexity, cost considerations, and the level of customization required.

To know more about application integration, refer here:

https://brainly.com/question/32734594#

#SPJ11

Which jewelry company produces the super bowl trophy each year?.

Answers

Answer:

Tiffany & Co

Explanation:

they have made it since the very first super bowl!

Tiffany and co. Since 1970

How did Eli Whitney invention changed American life

Answers

His Cotten gin was a very helpful machine because it made removing Cotten very easy

Why is the number 270 so important when it comes to electoral college

Answers

Answer:Answer being created

Explanation:

Answer:

In order to win the election, a candidate must reach at least 270 votes from the electoral college. If niether candidate reaches the minimum of 270 out of the 538 electoral college votes, then the House of Representatives decides the next president.

Explanation:

Describe the separation of powers in Georgia's state government.

Answers

Answer:The Georgia General Assembly makes the laws. The government enforces the laws. Georgia Supreme Court interprets the laws.

Explanation:

This territory was the site of numerous Spanish missions but was severely depopulated in the 17th century by infectious disease and warfare with other Indian tribes

Answers

Answer:

The Mocama province

The Mocama Province was faced by a number of challenges that led to a sharp decline in its population. It was first plagued by a an infectious disease.In addition, there were series of war between the Spanish colonialists and the English crown forces in the North. Remnant refugees from the province were resettled at st. Augustine.

Explanation:

One student, Chris, is a true problem for Mr. Smith. Mr. Smith has heard that Chris has been arrested multiple times, beginning at 10 years of age. According to life course theory, when were the seeds of a criminal career planted for Chris?

Answers

Answer:

The options are

a. Infancy

b. Preschool

c. Elementary school

d. Middle school

The answer is B. Preschool

Explanation:

An individual’s behavior is usually influenced very early in life which could be around early childhood. This is the period an individual is inquisitive and copies stuffs he sees or watches or behave in a similar fashion to people who are always around him/her.

Mr. Smith hearing that Chris has been arrested multiple times, beginning at 10 years of age means that according to life course theory, the seeds of a criminal career were planted in Chris around the period of Pre-School.

how to get notifided and recieve sms messages from my phone to your own phone using automation skills

Answers

The best option regarding SMS notifications will depend mainly on one's specific needs and the resources which are available to us.

There are a few different ways to set up automated SMS notifications from your phone to another phone, depending on the type of phone you have and the tools you have available. Here are some options you can consider:

Use an SMS gateway service: Many companies offer SMS gateway services that allow you to send automated SMS messages from your phone to another phone. To use this type of service, you'll need to sign up for an account with the provider, and then use their API or a third-party tool to send the SMS messages from your phone.Use a task automation app: There are several apps available that allow you to automate tasks on your phone, including sending SMS messages. For example, you could use an app like IFTTT (If This Then That) or Zapier to set up a "recipe" that automatically sends an SMS message to another phone whenever a specific trigger occurs.Use a script or program: If you have some programming experience, you could write a script or program that sends SMS messages from your phone to another phone. Depending on your phone and your programming skills, you might be able to do this using a language like Python or Java, or by using a tool like the SMS Gateway API.

Learn more about SMS gateway at:

brainly.com/question/2692918

#SPJ4

What system allowed Southern colonies to succeed in growing crops like tobacco and rice?

Answers

The plantation system allowed Southern colonies to succeed in growing crops like tobacco and rice.

The Southern countries are the most successful countries in growing crops like tobacco and rice. This is because of soil fertility, land, use of labor, and favorable conditions. The warm and humid climate was the ideal climate for the growth of rice and tobacco crops.

The use of slave labor and animals is the most successful reason for the success of Southern agriculture. The slave labor system allowed the large-scale cultivation of crops and also the accumulation of wealth by plantation owners and also access to large waterways.

To learn more about the Plantation system

https://brainly.com/question/19245167

#SPJ4

write 250 word essay on parenthood, occupational choice and risk
.

Answers

Parenthood, Occupational Choice, and Risk

Parenthood is a transformative phase in a person's life, and it often influences one's occupational choices and perception of risk. When individuals become parents, their priorities and responsibilities shift, leading them to make decisions that prioritize the well-being and stability of their family.

Occupational choice is greatly influenced by parenthood. Many individuals opt for professions that offer stability and financial security to support their growing families. They may choose careers that provide a steady income and benefits, even if it means sacrificing personal passions or ambitions. Parenthood motivates individuals to prioritize the needs of their children and seek job security to ensure a comfortable life for them.

Furthermore, parenthood alters the perception of risk. Parents tend to become more cautious and risk-averse as they have dependents relying on them. They may be less inclined to take on risky ventures or career paths that involve uncertainty or volatility. Stability and security become paramount, as parents strive to provide a stable environment for their children to grow and thrive.

However, it is important to note that parenthood and occupational choices are subjective and can vary greatly among individuals. Some parents may choose to pursue careers that align with their passions, even if they involve higher levels of risk or instability. Others may strike a balance between fulfilling their personal aspirations and ensuring the financial security of their family.

In conclusion, parenthood significantly influences occupational choices and the perception of risk. It often leads individuals to prioritize stability, financial security, and the well-being of their children. While some parents may choose to take calculated risks, many tend to opt for professions that provide stability to support their growing families. Parenthood is a transformative journey that shapes individuals' career paths and alters their perception of risk, ultimately guiding them towards choices that benefit their loved ones.

Learn more about Financial Security :

https://brainly.com/question/28804940

#SPJ4

Why were many Americans Indian groups angry about the location of the Northwest Territory

Answers

Answer:

The tribes were angered by British colonials moving to settle in their territories. They attacked during Pontiac's Rebellion of 1763–66, when the Natives succeeded in burning several British forts. They killed and drove many settlers out of the Northwest Territory.

Explanation:

plz give brainliest and thanks

What can a nation do to improve the exchange rate of it's currency?

oA. try to export less while importing more

oB. try to decrease its trade surplus

oC. try to improve its balance of trade

oD. try to lower its gross domestic product (GDP)​

Answers

Answer:

C. try to improve its balance of trade.

A nation can improve the exchange rate of its currency by taking measures to improve its balance of trade. This can be done by increasing exports or reducing imports, which can be achieved through various policies such as promoting domestic industries, reducing trade barriers, or implementing export subsidies. When a nation has a positive balance of trade, meaning it exports more than it imports, there is increased demand for its currency, which can lead to an increase in its exchange rate.

how many hours is it to Tokio from Idaho

kenji helppp​

Answers

Answer:

5,216 mi

Explanation:

173 minutes so convert that to hours

Why did Native American raids in West Texas increase during the Civil War?​

Answers

Answer: Law enforcement left to serve in confederate army

many packages have labels that help stores control inventory and give the retailer information about the product’s price, size, color, and other attributes. these are

Answers

The characteristic features of a product which gives information about the size, color and other product attributes are called product description or specifications.

The product description column is of immense importance to retailers as most of the required information about a product and it's specification are contained here.

Attributes such as color, size, and other product specific features can be found in the product specification tab.

Learn more : https://brainly.com/question/25696648

Dr. Rice administers a selection test to a group of job applicants for a manufacturing job. Years later, he then collects performance appraisal ratings of these workers so he can assess to what extent scores on the selection test correlate with performance on the job. Dr. Rice is assessing the _______ of the test.

Answers

In this selection test for the group of job applicants, Dr. Rice is assessing the productive validity of the test by assessing whether the selection test correlate with performance on the job

What is productive validity?

A productive validity means an extent to which a score predicts the scores other criterion measure.

In conclusion,Dr. Rice is assessing the productive validity of the test by assessing whether the selection test correlate with performance on the job.

Read more about productive validity

brainly.com/question/6560052

When did the Tulsa Race Massacre occur?
PLEASE HELP ASAP AND NO LINKS FOR BRAINLESS!!!

When did the Tulsa Race Massacre occur?PLEASE HELP ASAP AND NO LINKS FOR BRAINLESS!!!

Answers

Answer:

C. Post World War I.

Explanation:

The infamous Tulsa Race Massacre is an event that occurred from the night of May 31 to June 1, 1921, in the Oklahoma city of Tulsa. This horrific event lasted for 18 hours during which white mobs attacked and killed hundreds of black people and rendered thousands homeless.

This event would remain one of the worst incidents of racial discrimination in the history of America. A white mob gathered and then systematically attacked, destroyed, and killed black residents and damaged businesses owned by black owners in the residential Black Greenwood neighborhood of Tulsa. This event happened after the First World War (1914-18).

Thus, the correct answer is option C.

answer the following question in at least two sentences. in your opinion is it important for citizens to vote why or why not?

Answers

Answer: maybe because they could be winning for there country that is in a war . they could be voting for something new

Explanation:

Other Questions
which of the following measures would a president adhering to supply-side economic principles most likely employ during an economic recession? his father.23. Which of the following best describes how the speaker in "The Rainy Day" feelsabout his youth?A He regards the past with longing and regret.B He gets great joy and comfort recalling the past.CHe sees the past as an inspiration to change the present.D He derives great satisfaction from his past accomplishments.FA Discuss the following statement. If prices are likely to increase as decrease, why do investors, earn positive returns from the market on average? (5 marks) Click or tap here to enter text. which two houses are part of the united states congress? Empty inverted glass is not immersed in water, why? express the following statement in if-then form. fix my ceiling or i won't pay my rent. if you don't fix my ceiling, then i will pay my rent. if i pay my rent, then you won't fix my ceiling. if you don't fix my ceiling, then i won't pay my rent. if you fix my ceiling, then i won't pay my rent. if i won't pay my rent, then you won't fix my ceiling. You purchased a zero-coupon bond with a $1000 face value with 6 years left until maturity at a 7.6% (EAR) yield to maturity. When you sell it exactly one year later, it has a 7% (EAR) yield to maturity. What was the return on your investment expressed as an EAR how many grams of NaOH are needed to neutralize100.00mL kg 0.050M H20 (pls show work) graph the line y = - 5x + 3 Solve the equation. You may find using algebra tiles to be helpful. 2x + 9 = 15 50 Points! Multiple choice geometry question. Photo attached. Thank you! Manuel and a colleague are working on a project together. Manuel wants to do the project one way and the colleague wants to do it another. Being the lead on the project, how can Manuel best respond assertively? Manuel says the other persons ideas are better. Manuel says the other persons ideas are too ridiculous to use. Manuel says he will take the suggestions under consideration. Manuel says, sarcastically, that the other person has such good ideas. Approximately what proportion of learners with exceptionalities are diagnosed as having learning disabilities I dont know the answer please help me The gain or loss that results from an investment over a specified period of time is known as:A) risk.B) return.C) probability.D) value. Which of the following represents a duplication in the DNA sequence A-G-T-C-T? 1. T-C-A-G-A 2. A-G-G-T-C-T 3. A-G-T-C-T 4. G-A-C-T-T )Helppp tuition would be increasing 2.5% for next year, with no changes to fees or room and board. this describes which element of the universitys marketing mix? Match each of these periods of ancient Greek art with the technique that wasdeveloped during that period.Hellenistic?Black-figure pottery?Frieze carvingClassicalLinear perspectiveArchaic please helppp Q C A system consists of three particles, each of mass 5.00g , located at the corners of an equilateral triangle with sides of 30.0 cm . (b) Assume the particles are released simultaneously. Describe the subsequent motion of each. Will any collisions take place? Explain. which statement accurately compares developments in Judaism and Christianity